Τελευταία νέα
HomeInfrastructure (Page 5)

Infrastructure

The second and final phase follows enthusiastic demand for the recent first phase launch of properties at Al Yasmeen. Al Yasmeen

It's important to be ready for the cold to arrive as it can be tougher to deal with once it

The development of the Construction Village, which will be home to 10,000 construction workers, is nearing completion with all 1,876

The expansion also includes the current extension works to the western side of the existing building.

A floating dock has many benefits, and to acquire them, you must be careful in your choice of materials. Installing

Cavotec will design, engineer, supply, install, test, and commission a large number of 400Hz Powerpack bridge- and ground-mounted systems, bridge-mounted

Property and construction consultants scaling up in the Mediterranean region.

The contract has been awarded to support the creation of a sustainable gateway which will open up Saudi Arabia to

To optimize the protection of the rich coral habitat and the local ecology, The Red Sea Development Company is deploying

The Port will postpone work on the proposed Terminal 46 cruise terminal. The Port needs to better understand the market

15/05/2023
12/05/2023
11/05/2023
10/05/2023
09/05/2023